Monday, February 23, 2009
Quick update
This week I will try to get the penninsula finished up, but I will be really busy at work so I'm not sure how much I will be able to get accomplished.
Looks like we will have to make another IKEA run to pick up some more drawer pulls and small bits that we are short. Maybe next weekend.
More pics soon.
Wednesday, February 18, 2009
Time off for some fun
Pat was great and really encouraged me to go. Even on Valentine weekend!
Dave
As you can see the weather was beautiful.
On the way up to Peak 9.
What a view!
This was my first time boarding in Colorado and it was a great experience. Definitely in another league than the corn fields of Ohio.
Wednesday, February 4, 2009
We have water!!
The plumber came today and finished the connections to the sink, faucet, disposal and DW. He also made the connection to the gas cooktop as well. So we can now cook in the kitchen again! I still have detail work to finish up, but I was able to get alot done in the past week or so.
I fabricated and installed the stainless backsplash this past weekend. Eventually, I will tile the wall around the SS. I still haven't made a final decision on the tile yet. I'm considering glass tile or a subway tile. Color is another story too, but I don't expect to get to this until after we have our final countertop installed anyway.
Last week,
I built the temporary countertop for the penninsula and the phone nook (not shown). I still have trimwork to finish on the penninsula. That's on the list for this week.
Also on the list is installing all the cabinet pulls, getting the microwave vent ductwork fabricated (it needs to be custom made), some detail work on the closet, and touchup painting. Then next week I take off for some snowboarding in Colorado with my brother....can't wait.
Friday, January 23, 2009
It's a kitchen....almost!
The past week or so I have gotten the cabinets, appliances and butcher block countertop installed. Finished the under-cabinet lighting and connected the circuit for the floor warming system. It was a relief when it worked.... Oh, and the sink and the faucet were delivered.
Before the final coat of polyurethane.
So now this is where things stand today. Hopefully I can get the plumber here next week to finalize the plumbing and hook up the gas to the cooktop. I bought a piece of stainless steel to use as the backsplash behind the cooktop. I'll start fabricating it this weekend. Then I'll be working on small details and will turn my attention to finishing the penninsula. Almost there!
Thursday, January 22, 2009
Trimwork and cabinets
Dad was able to get the trimwork done quickly so we started putting together the IKEA cabinets and prep for install.
Wednesday, January 21, 2009
Finished tiling
I finished tiling the kitchen floor at the end of November. The cheapo power drill I bought to mix thinset with died on the second last batch. :( RIP!
Overall it took about 4 weeks nights and weekends. It was my first time tiling anything, and but once I got the hang of it seemed to go alright. I'm happy with the results.
Here are some pictures of the steps leading down to the basement and side door before tiling. The plywood are temporary steps until I finished the new treads.
These are the steps leading upstairs and to the living room. The pink paint looks to be original. I uncovered it after removing carpeting when we moved in.


Tuesday, January 20, 2009
Making progress again
Alot going on since Aug: vacationing in Thailand, busy at work, golfing in San Diego....and a little bit of work on the kitchen in there too.In between vacations I have been able to make some progress...finished the ceiling, painted and installed the lighting. Walls are primed and realy for paint.
Also, finally making progress on the floor again. Installed the heating system a couple weeks ago which went down brilliantly.
Here is what the floor looks like when the mats are installed and before the self-leveling cement is poured.
I only installed the heating mats in the main traffic area, not under the cabinents (for obvious reasons).Another shot after the self-leveling cement is poured. I had to work fast since I was using rapid-set. I used 1/4" foam strip/tape to dam the doorways and openings to contain the SLC.
We found a beautiful natural slate at "Big Orange" of all places...long story. 
Anyway picked it up last Friday and starting putting down the tile this past weekend. Including preparing the subfloor and tiling, I've lost count of the batches of thinset I have mixed so far... my power drill was literally smoking the other day.Once the tilework is complete, the IKEA cabinets go in....hooray! Starting to see the light at the end of the tunnel....Dad offered to come up again and help with th
e trimwork, which I'm sure will be a bigger job than it seems.More soon.
Time for a vacation...
Sunday, January 4, 2009
Detour...

The project is starting to look like a room again...not a kitchen yet, but a room.
After getting some primer on the walls, I spent a week preparing the subfloor for tile. Put down 5/8" ply over the original 3/4" T&G subfloor, then 1/4" HardiBacker. 15 sheets of HardiBacker...in thinset. After the first sheet of HardiBacker I realized I was going to need alot more thinset...and a power drill. I also wished I just screwed it directly into the ply. But at that point I was committed and I'm not about taking shortcuts. Oh well, just another trip to "Big Orange." Thanks to the guys at the www.floorstransformed.com forums for great info on preparing a subfloor for tile. Check it out if you are planning to tile.

Not sure how many batches of thinset I mixed, something like seven bags I think.

That bit of open wall is for running the wiring for the floor heat mats which will go down this week.
Now for the detour...
Then after some more thinking and encouragement from a friend, we decided to remove the wall between the kitchen and dining room. I didn't think of it earlier, but I like the idea. It will really open up the kitchen to the rest of the house. I wish I had considered this earlier.... like before the drywall was up!!!
Roadtrip

Also continued to hang drywall and work thru other details....like the cooktop vent placement. There was an existing vent opening already in the wall, but of course, it ended up being too low, so I needed to cut a hole for a new one. This was not as easy as it sounds because the outside siding is stone...um, fake stone made from cast concrete rather. My sawzall wasn't up to the task and the access was impossible for a circular saw with a diamond blade. Thanks to the suggestion from a friend, a 4" grinder with a diamond blade....worked like a charm.




















