Tuesday, March 17, 2009

New Photos

Several people have commented as to the lack of new photos. Sorry for taking so long to get an update posted. So as promised here are some photos from tonight. I still have the pennisula wine rack and other some odds & ends to finish up but, we have been using the kitchen for several weeks now. So far so good!


We opted for base cabinets with large pull-out drawers instead of doors. We really like how they provide full access without having to reach into deep cabinets.

The temporary countertop is not holding up very well. I used a water-based urethane to seal the MDF. I learned it does not repel water. I suppose I should have thought that one through a bit better... It is severly watermarked, but will do until we get get the new countertops.


We unpacked most of the kitchen stuff this past weekend. It looks like we have massive amounts of storage with all the drawers and wall cabinets, but it was surpisingly easy to fill them up.

Chester likes the heated floor...



Pat enjoying her new cooktop...


The penninsula is still a work in progress. The cabinets are pulled out in this shot so I can glue the upper trim piece in place.


So that's it, let me know what you think. In the future, I will be more regular with my updates. I'll try to post at least once a week, more frequently if I have anything interesting...which is unlikely.

Monday, February 23, 2009

Quick update

This weekend I worked on some of the small bits that are still not finished like painting some door trim, caulking baseboard gaps, shelving in the closet, etc. Nothing too exciting just those last minute details.

This week I will try to get the penninsula finished up, but I will be really busy at work so I'm not sure how much I will be able to get accomplished.

Looks like we will have to make another IKEA run to pick up some more drawer pulls and small bits that we are short. Maybe next weekend.

More pics soon.

Wednesday, February 18, 2009

Time off for some fun

Met my brother Dave, for a few days of skiing and boarding in Breckenridge this past weekend. He was in Denver for a medical conference, so I cashed in some frequent flier miles and flew out on Friday evening to meet him. We rolled into Breckenridge a bit after 1am.
Pat was great and really encouraged me to go. Even on Valentine weekend!


Dave


As you can see the weather was beautiful.

On the way up to Peak 9.


What a view!

This was my first time boarding in Colorado and it was a great experience. Definitely in another league than the corn fields of Ohio.

Wednesday, February 4, 2009

We have water!!

We finally have running water in the kitchen again. It's been just over seven months since we have had a functional sink in the kitchen.

The plumber came today and finished the connections to the sink, faucet, disposal and DW. He also made the connection to the gas cooktop as well. So we can now cook in the kitchen again! I still have detail work to finish up, but I was able to get alot done in the past week or so.
I fabricated and installed the stainless backsplash this past weekend. Eventually, I will tile the wall around the SS. I still haven't made a final decision on the tile yet. I'm considering glass tile or a subway tile. Color is another story too, but I don't expect to get to this until after we have our final countertop installed anyway.















Last week, I sealed the IKEA Numerar beech butcher block countertop with three coats of Waterlox (original formula). I hope three is enough because although it creates a beautiful finish the stuff really stinks. It has been curing for over a week and we can still smell it. If I had known it was so stinky, I would have used another finish. Anyway, I really like how it turned out. After if finishes curing (4 weeks or so), I want to sand/buff it to get it smoother. It seems to have raised the wood grain in some places.


I built the temporary countertop for the penninsula and the phone nook (not shown). I still have trimwork to finish on the penninsula. That's on the list for this week.


Also on the list is installing all the cabinet pulls, getting the microwave vent ductwork fabricated (it needs to be custom made), some detail work on the closet, and touchup painting. Then next week I take off for some snowboarding in Colorado with my brother....can't wait.

Friday, January 23, 2009

It's a kitchen....almost!

It's starting to feel like a kitchen now! I think I'm finally in the home stretch. My goal the past week or so has been to get the cabinets and countertop installed so we can have the sink and cooktop hooked-up and have a functional kitchen again. I've forgotten what it is like to have a normal kitchen. Pat has been able to do amazing things with just a microwave and a rice cooker, but she is ready to have a kitchen again.

The past week or so I have gotten the cabinets, appliances and butcher block countertop installed. Finished the under-cabinet lighting and connected the circuit for the floor warming system. It was a relief when it worked.... Oh, and the sink and the faucet were delivered.


We have been trying to finalize our decision for the countertop: granite or concrete. We like the creativity concrete provides, but the time involved to make it will mean at least another 3-4 weeks without a kitchen. So we are also considering going with granite, but it's a bit out of our budget and the low-cost pre-fabbed slabs have their own issues as well. So in the meantime, I made temporary countertops from MDF to use until we make our final decision.


Before the final coat of polyurethane.


So now this is where things stand today. Hopefully I can get the plumber here next week to finalize the plumbing and hook up the gas to the cooktop. I bought a piece of stainless steel to use as the backsplash behind the cooktop. I'll start fabricating it this weekend. Then I'll be working on small details and will turn my attention to finishing the penninsula. Almost there!

Thursday, January 22, 2009

Trimwork and cabinets

Dad came up again in early December to help with the trimwork. He does good work.

Dad worked during the day when I was at work and was able to get alot done. Pat & I finally made a decision on paint color and I painted the walls.



I replaced the door thresholds. Only took four attempts to trim the door to the right height. It is really cold out, so I was glad to get the new thresholds in.


Dad was able to get the trimwork done quickly so we started putting together the IKEA cabinets and prep for install.
This is just some of the boxes that were taking over the basement (there are more that what is shown in the photo).





The first wall cabinets going up.

North wall cabinets
South wall cabinets
We decided to build the cabinet bases from wood rather than use the IKEA plastic feet for a couple reasons. Not sure if it worked out to be easier in the end though.

Wednesday, January 21, 2009

Finished tiling



I finished tiling the kitchen floor at the end of November. The cheapo power drill I bought to mix thinset with died on the second last batch. :( RIP!

Overall it took about 4 weeks nights and weekends. It was my first time tiling anything, and but once I got the hang of it seemed to go alright. I'm happy with the results.



Here are some pictures of the steps leading down to the basement and side door before tiling. The plywood are temporary steps until I finished the new treads.


These are the steps leading upstairs and to the living room. The pink paint looks to be original. I uncovered it after removing carpeting when we moved in.












Here is what the completed floor looks like. I decided to tile the entire floor to help make leveling the cabinets easier. I hope the extra effort was worth it...

And some shots of the finished stairs.





Next up is door and window casings and baseboards...and cabinets, hooray!

Tuesday, January 20, 2009

Making progress again

Note: this was originally posted on my old blogsite in early November.

Alot going on since Aug: vacationing in Thailand, busy at work, golfing in San Diego....and a little bit of work on the kitchen in there too.In between vacations I have been able to make some progress...finished the ceiling, painted and installed the lighting. Walls are primed and realy for paint.

Pat and I are still trying to find a color theme that we both can agree on. We have on idea, but haven't found the right shade.

Also, finally making progress on the floor again. Installed the heating system a couple weeks ago which went down brilliantly.

The mats come in rolls. Simply select the correct size for your room layout.


















Here is what the floor looks like when the mats are installed and before the self-leveling cement is poured. I only installed the heating mats in the main traffic area, not under the cabinents (for obvious reasons).













Another shot after the self-leveling cement is poured. I had to work fast since I was using rapid-set. I used 1/4" foam strip/tape to dam the doorways and openings to contain the SLC.


















We found a beautiful natural slate at "Big Orange" of all places...long story.













Anyway picked it up last Friday and starting putting down the tile this past weekend. Including preparing the subfloor and tiling, I've lost count of the batches of thinset I have mixed so far... my power drill was literally smoking the other day.Once the tilework is complete, the IKEA cabinets go in....hooray! Starting to see the light at the end of the tunnel....Dad offered to come up again and help with the trimwork, which I'm sure will be a bigger job than it seems.More soon.

Time for a vacation...


I finished rerouting the light switches and framing the wall and ceiling transitions after we got back from IKEA Sunday. I needed to get the cabinets that are going to be used in the peninsula and exchange another cabinet for a different size. Mental note: don't go to IKEA on Sunday at noon...it was packed.

The goal for this week is to get the serving bar/penninsula frame and drywall finished and paint the walls so I can pick up where I left off on the floor.
Here are some shots of the penninsula frame coming together.







I was hoping to have the cabinets and a temporary countertop installed for the sink before we take off for vacation next week, but I don't think that is going to happen. I think I will be lucky to get the floor tiled. I friend of mine offered to help out this week, so hopefully we can make allot of progress. After a couple weeks in the islands of the south of Thailand, I should be rejuvenated to get this project completed.

Sunday, January 4, 2009

Detour...

After almost four weeks of mudding, sanding, mudding, sanding and more mud and sanding, the walls/ceiling are starting to take shape. Here's a shot of Dad helping out before he got smart and went home. Even an unlimited supply of beer couldn't convice him to stick around for this phase.



The project is starting to look like a room again...not a kitchen yet, but a room.

After getting some primer on the walls, I spent a week preparing the subfloor for tile. Put down 5/8" ply over the original 3/4" T&G subfloor, then 1/4" HardiBacker. 15 sheets of HardiBacker...in thinset. After the first sheet of HardiBacker I realized I was going to need alot more thinset...and a power drill. I also wished I just screwed it directly into the ply. But at that point I was committed and I'm not about taking shortcuts. Oh well, just another trip to "Big Orange." Thanks to the guys at the www.floorstransformed.com forums for great info on preparing a subfloor for tile. Check it out if you are planning to tile.





Not sure how many batches of thinset I mixed, something like seven bags I think.


That bit of open wall is for running the wiring for the floor heat mats which will go down this week.

Now for the detour...
Then after some more thinking and encouragement from a friend, we decided to remove the wall between the kitchen and dining room. I didn't think of it earlier, but I like the idea. It will really open up the kitchen to the rest of the house. I wish I had considered this earlier.... like before the drywall was up!!!

Here is a shot from the dining room before surgery.


Once the wall was down, I needed to reroute the electric which will be a pain now that the drywall is done. Looks like I will have to punch some holes in the ceiling that I just finished....And after...The plan is to put in a compact food service/eating island.






Another roadtrip to IKEA is in our future to pickup the cabinets that I am going to use for the island.Here is a quick sketch of the island design. Specs are: size will be 24x48. Tall wall cabinets on each end and a custom wine rack in the center.